Optimizing The Number Of Mechanic Crews And Heavy Equipment Replacement Rule Options To Reduce Heavy Equipment Unplanned Downtime, Enhance Heavy Equipment On Running, And Maximize Profit At PT. XYZ’s Construction Project
Abstract
This research aims to reduce unplanned downtime, enhance the on-running time, and maximize profits from heavy equipment in PT. XYZ's construction projects through the application of Agent-Based Modeling (ABM). The study uses ABM to simulate the interaction between mechanical crews and heavy equipment units. It explores various optimization scenarios involving the number of crews and heavy equipment replacement rule options. Data was collected from field observations, and company internal reports, then implemented in AnyLogic software for simulation. The simulation results indicate that a combination of five mechanical crews and a heavy equipment replacement rule option after five preventive maintenance (PM) periods significantly reduces unplanned downtime by 6.13%, increases on-running time to 89.32%, and maximizes profit to Rp. 11,052.04 million. Model validation via a two-sample t-test shows no significant difference between real and simulated data (P-value = 0.3908). This research introduces an integrated ABM approach that combines equipment availability, maintenance crew availability, and profit optimization, bridging gaps left by prior studies that analyzed these factors separately. The findings provide practical insights into optimizing heavy equipment management, emphasizing the importance of proactive maintenance strategies and efficient resource allocation to reduce operational costs and improve sustainability in large-scale construction projects.
Downloads
Copyright (c) 2026 Ami Ami, Manahan Siallagan

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
An author who publishes in the EKOMBIS REVIEW: Jurnal Ilmiah Ekonomi dan Bisnis agrees to the following terms:
Author retains the copyright and grants the journal the right of first publication of the work simultaneously licensed under the Creative Commons Attribution-ShareAlike 4.0 License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal
Submission of a manuscript implies that the submitted work has not been published before (except as part of a thesis or report, or abstract); that it is not under consideration for publication elsewhere; that its publication has been approved by all co-authors. If and when the manuscript is accepted for publication, the author(s) still hold the copyright and retain publishing rights without restrictions. For the new invention, authors are suggested to manage its patent before published. The license type is CC-BY-SA 4.0.
EKOMBIS REVIEW: Jurnal Ilmiah Ekonomi dan Bisnis is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.








