1.
Trianshy M, Edriani A, Bahri S. Analisis Faktor Cost Overrun Dan Time Overrun Pada Proyek Konstruksi Di Kota Bengkulu. mude [Internet]. 11Apr.2022 [cited 24Nov.2024];1(2):27 -. Available from: https://jurnal.unived.ac.id/index.php/mude/article/view/2063