1.
Ami A, Siallagan M. Optimizing The Number Of Mechanic Crews And Heavy Equipment Replacement Rule Options To Reduce Heavy Equipment Unplanned Downtime, Enhance Heavy Equipment On Running, And Maximize Profit At PT. XYZ’s Construction Project. EKOMBIS [Internet]. 26Jan.2026 [cited 6May2026];14(1):595–612. Available from: https://jurnal.unived.ac.id/index.php/er/article/view/8352